Body Preparation - Page 1

The body is near ready for color. The body didn't have much of a problem with rust, but had just enough additional texture to require attention. The biggest problem was previous repairs of physical damage. The floorboard supports are to be riveted in place next.
 

 
Paint preparation was done on individual pieces to avoid primer build-up, or "bridging" at the body seams.


Click on the arrow to see more body preparation.

Use the Back button on your browser or click on the arrow to return.


©1998 Marco Tahtaras